Main Engine t. SKL 6VDS 48/42 AL-2
Engine no. 1
- Replacement of 7 pieces of main bearings
- Replacement of 7 pieces of cam-shaft bearings
Engine no.2
- Preparation of the oil pan and the lower part of the block for shaft installation
- Transport and assembly of the shaft after prior preparation in the workshop (reaming holes for the flywheel and vibration damper)
- Installation of counter-weights
- Installation of crank bearings
- Arrangement of the upper parts of the frame bearing housings and presses
- Installation of the flywheel and vibration damper
- Assembly and tightening of the block
- Tightening the frame bearings
- Replacing the cam-shaft bearings
- Piston assembly
- Installation of fire rings
- Installation of cooling water jackets
- Installation of cylinder heads with accessories
- Installation of fuel pumps
- Installation of the turbine with the casing
- Installation of the air cooler with the housing
- Piping system installation (ME cooling pipes, injector cooling pipes, charge air cooling, fuel rail installation and adjustment)
- Checking the cam-shaft setting (checking the valve timing)
- Starting the engine with delivery and acceptance tests