Engine no. 1

  1. Replacement of 7 pieces of main bearings
  2. Replacement of 7 pieces of cam-shaft bearings

Engine no.2

  1. Preparation of the oil pan and the lower part of the block for shaft installation 
  2. Transport and assembly of the shaft after prior preparation in the workshop (reaming holes for the flywheel and vibration damper) 
  3. Installation of counter-weights 
  4. Installation of crank bearings 
  5. Arrangement of the upper parts of the frame bearing housings and presses 
  6. Installation of the flywheel and vibration damper 
  7. Assembly and tightening of the block 
  8. Tightening the frame bearings 
  9. Replacing the cam-shaft bearings 
  10. Piston assembly 
  11. Installation of fire rings 
  12. Installation of cooling water jackets 
  13. Installation of cylinder heads with accessories 
  14. Installation of fuel pumps 
  15. Installation of the turbine with the casing 
  16. Installation of the air cooler with the housing 
  17. Piping system installation (ME cooling pipes, injector cooling pipes, charge air cooling, fuel rail installation and adjustment) 
  18. Checking the cam-shaft setting (checking the valve timing) 
  19. Starting the engine with delivery and acceptance tests

 

 

silnik-glowny-t-skl-6vds-48-1
silnik-glowny-t-skl-6vds-48-2
silnik-glowny-t-skl-6vds-48-3
silnik-glowny-t-skl-6vds-48-4
silnik-glowny-t-skl-6vds-48-6
silnik-glowny-t-skl-6vds-48-5
silnik-glowny-t-skl-6vds-48-7